Seawall contractors working through Westview
When a Westview seawall gets replaced the yard behind it is torn up for the duration, and nothing permanent can sit near the Little River Canal. For Westview seawall crews we put a standard unit and a handwashing station at the top of the drive, because the back yard belongs to the excavator. We set the restroom on the street side of a Westview job, clear of the pile rig and the spoil pile, where a service truck can still pull alongside.
Access on many Westview waterfront parcels is a single-car drive, so the unit goes where it never blocks a concrete truck. Ground behind a Westview seawall is sand fill over limestone, and it turns to slurry the moment the dewatering pumps start running. We cover Westview on a set route, which is why a service day here does not drift around.
Public shoreline maintenance in Westview
Public boat ramps around Westview get rebuilt roughly every decade, and the ramp closes for the whole contract. A Westview park job gets units serviced before opening hours, so the public never has to see the truck. We place units at the Westview contractor compound and a second one at the public end if the park stays open.
Bollards and gates on Westview waterfront paths mean the last stretch gets done by hand. Long jobs in Westview and one-day events come off the same schedule.
Bank stabilisation across Westview
Lakefront homes in Westview rebuild docks and boardwalks even where only small boats ever go. Units on Westview lake work move around the shoreline as the crew advances along the bank. Handwashing stations go in wherever Westview crews are working in lake water and muck all day.
Fill taken off a Westview bank has to be stockpiled somewhere, and that takes the only flat ground. We would rather ask two questions about a Westview address than send a truck out twice.
