Bank stabilisation across West Hollywood
Control structures between the West Hollywood lakes and the canal system need rebuilding every so often. Units on West Hollywood lake work move around the shoreline as the crew advances along the bank. Association jobs in West Hollywood want the unit screened, and we set it where it is least visible from the houses.
Wet season levels in West Hollywood lakes rise far enough to cover the working bench the crew cut. The bank at a West Hollywood lake is steeper than it looks, and units go well back from the edge. A short call about the West Hollywood approach saves an hour on delivery day.
West Hollywood canal banks and king pile work
When a West Hollywood seawall gets replaced the yard behind it is torn up for the duration, and nothing permanent can sit near the C-9 canal. We service West Hollywood seawall sites early, before the barge crew stages material and the driveway fills up with panels, forms and rebar. For West Hollywood seawall crews we put a standard unit and a handwashing station at the top of the drive, because the back yard belongs to the excavator.
Contractors in West Hollywood often work a whole block of State Road 7 at once, and the units follow the crew from one lot to the next. Getting the West Hollywood spot right on day one saves everybody trouble later on.
Municipal waterfront work in West Hollywood
Public boat ramps around West Hollywood get rebuilt roughly every decade, and the ramp closes for the whole contract. The West Hollywood parks department tells us where the compound goes, and the unit goes with it. Units at a West Hollywood ramp project sit on the paved apron, well clear of the trailer turning circle.
Public use around a West Hollywood job never fully stops, so the compound stays fenced for the duration. We treat a West Hollywood order for one unit the same way as an order for twenty.
