Palm Springs placement, gates and tight drives
The swale between the curb and the drive in Palm Springs is where most of the delivery trouble starts. The driver walks a new Palm Springs site once, and after that the spot is fixed for the rest of the rental. A Palm Springs unit set on plywood spreads the load and keeps the swale from rutting through the wet season.
Rain turns a Palm Springs swale into a bog within the hour, and it stays that way for days. Mail, bins and parked cars on a Palm Springs street push the workable window into the middle of the morning. Orders for Palm Springs are taken Monday through Saturday, and Sunday is the one day nothing moves.
Outfalls, headwalls and bank repair in Palm Springs
Spoil coming out of Palm Springs has to be tested and trucked, which drags every schedule out past the original dates. Units on Palm Springs restoration work sit up on the access road, uphill of the settling area and clear of the pipeline. We move the Palm Springs unit forward as the pipeline advances, which usually works out to once a two weeks.
The Palm Springs working area is usually remote from any building, so there is nothing else on offer nearby. If a Palm Springs site changes shape mid-job, the unit moves along with it.
Marine contractors staging in Palm Springs
A crane pick over the house is sometimes the only way onto a Palm Springs waterfront lot with no side yard left. We keep the Palm Springs exchange simple, one unit off and one unit on, so the barge is not tied up waiting. We deliver a unit to the Palm Springs staging yard and the contractor's crew lifts it aboard with the rest of the load.
Weather cancels barge days in Palm Springs far more often than it cancels the land work. Long jobs in Palm Springs and one-day events come off the same schedule.