Water, sewer and drainage work in Opa-locka
Directional drilling beneath the Miami Canal at Opa-locka avoids the open cut but still needs a pit on either side. We move the Opa-locka unit forward with the trench, usually a block at a time as the pipe goes in. Utility crews in Opa-locka take a unit at the bore pit and another on the far bank, because crossing over wastes the shift.
Groundwater in Opa-locka is a foot or two down, so every trench runs with well points and pumps. Limestone under the sand in Opa-locka slows the digging and stretches every schedule that was written for it. Orders for Opa-locka are taken Monday through Saturday, and Sunday is the one day nothing moves.
After the water goes down in Opa-locka
Once a storm is named, every Opa-locka waterfront site has to be cleared, and that includes the restrooms. Units returning to Opa-locka after a storm often go to a different spot, because the site itself has changed. For Opa-locka recovery work we stage units at the debris site and the contractor yard, wherever the crews end up.
Debris piles along Cairo Lane in Opa-locka narrow the street to one lane and complicate every single delivery. The ground in Opa-locka stays saturated for weeks after a wet season storm, and nothing heavy crosses the swale. If an Opa-locka site changes shape mid-job, the unit moves along with it.
Crowds at the Opa-locka waterfront venues
A regatta staging out of Opa-locka needs facilities at the ramp as well as at the spectator end. For Opa-locka events we split the order between the ramp, the vendor row and the spectator seawall. Delivery for an Opa-locka waterfront event happens the day before, because the site fills with vendors at dawn.
Wind off the water at Opa-locka events will move anything that is not weighted, tents and units alike. Whatever the Opa-locka job turns into, the schedule can follow it.
