Access problems on the Norland waterfront
The older streets in Norland were laid out long before anyone drove a truck this size down them. Where a Norland drive is too tight, we hand-roll the unit in from the street on a dolly. We carry gate codes and contact names for Norland properties so a driver is never stuck at the entry.
A Norland corner lot usually has two approaches, and one of them is always better than the other. We would rather set a Norland unit slightly further out than risk a truck sinking into soft fill. Tell us what the Norland site looks like and the driver turns up with the right plan already made.
Restoring the Norland banks and shallows
Spoil coming out of Norland has to be tested and trucked, which drags every schedule out past the original dates. The Norland foreman picks the spot and we set on timbers, because the ground there is never properly dry. Units on Norland restoration work sit up on the access road, uphill of the settling area and clear of the pipeline.
Everything on a Norland dredge site ends up coated in fine silt, and the units need cleaning more often. Turbidity limits shut a Norland dredge down mid-shift more often than mechanical trouble ever does. We keep a note of the agreed spot on every Norland property so it does not get relitigated.
Loading out to the Norland waterfront
Contractors in Norland plan the water route first and the land route second, because the water route is the reliable one. Barge-set units in Norland get strapped down and blocked, because a unit that shifts underway is somebody's very bad day. We deliver a unit to the Norland staging yard and the contractor's crew lifts it aboard with the rest of the load.
There is no road shoulder at a Norland water-access site, so nothing can be left where it might float away. Most Norland jobs settle into a rhythm after the first service visit.
