Seawall contractors working through Lighthouse Point
The older bulkheads through Lighthouse Point were poured decades ago, and rusting rebar is what finally opens the cap along the Hillsboro Inlet. On a Lighthouse Point rebuild the unit moves twice, once when the old cap comes off and again when backfill goes in behind the new panels. We service Lighthouse Point seawall sites early, before the barge crew stages material and the driveway fills up with panels, forms and rebar.
Access on many Lighthouse Point waterfront parcels is a single-car drive, so the unit goes where it never blocks a concrete truck. Pickups in Lighthouse Point are booked the same way deliveries are, with a day and a window.
Lighthouse Point riverwalk and shoreline park projects
Public boat ramps around Lighthouse Point get rebuilt roughly every decade, and the ramp closes for the whole contract. We place units at the Lighthouse Point contractor compound and a second one at the public end if the park stays open. A Lighthouse Point park job gets units serviced before opening hours, so the public never has to see the truck.
Storm debris cleanup in Lighthouse Point parks uses the same compound the contractor already has fenced. Most Lighthouse Point jobs settle into a rhythm after the first service visit.
Lighthouse Point waterfront towers under construction
A waterfront tower in Lighthouse Point runs three years from the first sheet pile to the last balcony rail, and the crew list changes every quarter. A Lighthouse Point tower site typically holds units at grade near the trailer plus a cluster at the material gate off Federal Highway. Service on a Lighthouse Point high-rise runs two or three times a week once the drywall and paint crews are on the floors.
The approach on many Lighthouse Point projects is a single gate off Federal Highway, controlled by a flagger for the whole shift. We treat a Lighthouse Point order for one unit the same way as an order for twenty.
