Lauderhill park docks, ramps and fishing piers
Public boat ramps around Lauderhill get rebuilt roughly every decade, and the ramp closes for the whole contract. We keep Lauderhill park units out of the sight lines and near the maintenance access rather than the main entrance. Units at a Lauderhill ramp project sit on the paved apron, well clear of the trailer turning circle.
Park ground at Lauderhill is sand over fill and it holds water for days after heavy rain. Storm debris cleanup in Lauderhill parks uses the same compound the contractor already has fenced. A short call about the Lauderhill approach saves an hour on delivery day.
Shoreline work on the Lauderhill lakes
Fountain and aerator installations on Lauderhill lakes bring electrical crews down to the bank for a week. We place units at the Lauderhill lake access point, on the paved end of the maintenance easement. A Lauderhill bank repair crew works from the lot side, so the unit sits at the curb of the nearest street.
Maintenance easements around Lauderhill lakes are grass and will not take a loaded truck after rain. Heat and mosquitoes on Lauderhill lake work push those crews to very early starts. Every Lauderhill rental starts with a placement the crew and the driver both agree on.
Lauderhill seawall work, staged from the street
The older bulkheads through Lauderhill were poured decades ago, and rusting rebar is what finally opens the cap along the Plantation canals. A Lauderhill crew working tight against the Plantation canals keeps the unit forward by the equipment trailer rather than anywhere the crane can swing. We service Lauderhill seawall sites early, before the barge crew stages material and the driveway fills up with panels, forms and rebar.
Sand and shell backfill around Lauderhill settles unevenly for months, which is why we re-level units on the repeat service visits. Anything on the Lauderhill water gets a placement conversation before the truck is loaded.
