Highland Beach canal banks and king pile work
Waterfront lots in Highland Beach sit low against the Boca Raton Inlet, so cap elevations get raised whenever an old bulkhead comes out and a new one goes back in. On a Highland Beach rebuild the unit moves twice, once when the old cap comes off and again when backfill goes in behind the new panels. We service Highland Beach seawall sites early, before the barge crew stages material and the driveway fills up with panels, forms and rebar.
Tidal water pushes through the old joints in Highland Beach, so the working area stays wet and we keep the unit on firm ground near State Road A1A. We plan Highland Beach work around the tide and the traffic, in that order.
Highland Beach park docks, ramps and fishing piers
Waterfront park upgrades in Highland Beach bring new seawall, railing, boardwalk and lighting inside a single contract. For Highland Beach waterfront path work the unit moves along the alignment about once a week. A Highland Beach park job gets units serviced before opening hours, so the public never has to see the truck.
Park ground at Highland Beach is sand over fill and it holds water for days after heavy rain. We would rather ask two questions about a Highland Beach address than send a truck out twice.
Highland Beach waterfront towers under construction
A waterfront tower in Highland Beach runs three years from the first sheet pile to the last balcony rail, and the crew list changes every quarter. The Highland Beach superintendent tells us where the units live each month, because the laydown area moves along with the work. We schedule Highland Beach pump-outs around pour mornings, when the concrete pump owns the only usable approach to the site.
Dewatering keeps a Highland Beach excavation workable, and the discharge line decides which corner of the site stays usable. Anything on the Highland Beach water gets a placement conversation before the truck is loaded.