Dredging and shoreline restoration in El Portal
Stormwater outfalls into Biscayne Bay at El Portal corrode and undermine, and the repair digs up the bank on either side. The El Portal foreman picks the spot and we set on timbers, because the ground there is never properly dry. We place units at the El Portal spoil site and at the dredge tie-up, because the crew splits between the two all day.
Everything on an El Portal dredge site ends up coated in fine silt, and the units need cleaning more often. Access roads into an El Portal spoil area are cut fill and they rut badly after any real rain. Most El Portal jobs settle into a rhythm after the first service visit.
Loading out to the El Portal waterfront
Contractors in El Portal plan the water route first and the land route second, because the water route is the reliable one. We deliver a unit to the El Portal staging yard and the contractor's crew lifts it aboard with the rest of the load. We keep the El Portal exchange simple, one unit off and one unit on, so the barge is not tied up waiting.
Fuel docks and public ramps near El Portal are the only practical staging points for this kind of work. A short call about the El Portal approach saves an hour on delivery day.
Boat ramps and waterfront parks in El Portal
Park docks in El Portal are closed and rebuilt off-season while the public keeps using the rest of the site. An El Portal park job gets units serviced before opening hours, so the public never has to see the truck. For El Portal waterfront path work the unit moves along the alignment about once a week.
Storm debris cleanup in El Portal parks uses the same compound the contractor already has fenced. Tell us what the El Portal site looks like and the driver turns up with the right plan already made.
