Months-long jobs along the Davie water
The Davie route runs on fixed days, which is the reason a service day here does not drift. Billing periods on Davie rentals run to the month, and the unit stays until somebody says otherwise. Sites in Davie with a large crew move to twice-weekly service without anyone needing to call about it.
Summer heat and humidity in Davie raise usage, and the schedule reflects that from June onward. Wet season afternoons in Davie shut outdoor work down early, which shifts the whole service window. Long jobs in Davie and one-day events come off the same schedule.
Seawall and cap rebuilds across Davie
Most Davie seawall contracts run from the property line to the water, and the crew works the whole stretch of the South Fork of the New River frontage in a single pull. Placement on a Davie seawall job goes on plywood over the swale, since a loaded truck will not cross soft fill twice in the same week. For Davie seawall crews we put a standard unit and a handwashing station at the top of the drive, because the back yard belongs to the excavator.
Contractors in Davie often work a whole block of Griffin Road at once, and the units follow the crew from one lot to the next. Nothing about a Davie order needs to be complicated, and the fewer surprises the better.
Digging under the Davie waterways
Sewer force mains in Davie cross beneath the canals, and replacing one means a bore pit on each bank. We service Davie utility sites early, before the crew opens the road and the plates go down. Handwashing stations go out with every Davie sewer crew without anybody having to ask for them.
Limestone under the sand in Davie slows the digging and stretches every schedule that was written for it. Orders for Davie are taken Monday through Saturday, and Sunday is the one day nothing moves.
